{"id":30,"date":"2018-09-09T08:21:24","date_gmt":"2018-09-09T06:21:24","guid":{"rendered":"http:\/\/peuim.com.pl\/?page_id=30"},"modified":"2020-09-06T13:09:13","modified_gmt":"2020-09-06T11:09:13","slug":"roads","status":"publish","type":"page","link":"http:\/\/peuim.com.pl\/en\/roads\/","title":{"rendered":"Roads"},"content":{"rendered":"<p>The core business of PEUiM is road construction. The Company performs projects mainly in Podlaskie Voivodeship. The most important investments implemented by PEUiM in the recent years include:<\/p>\n<h3><strong>Rebuilding of regional road No. <\/strong><strong>676 Bia\u0142ystok \u2013 Supra\u015bl<\/strong><\/h3>\n<p><strong>Date<\/strong>: from June 2017 to November 2018.\u00a0<strong>Value<\/strong>: PLN 119,1 million.<\/p>\n<p>The reconstruction of the regional road on a section of of 9.8 km, covered the entire infrastructure, construction of engineering structures (including the construction of a 620 m long flyover over the river valley), earthworks, a new structure along the entire length of the road section and bicycle path, and paving works (curbs, pavements, outskirts, bus bays, drainage elements).<\/p>\n<figure id=\"attachment_135\" aria-describedby=\"caption-attachment-135\" style=\"width: 300px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/peuim.com.pl\/en\/wp-content\/uploads\/sites\/2\/2020\/08\/20181115_090343.jpg\" target=\"_blank\" rel=\"noopener noreferrer\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-135 size-medium\" src=\"http:\/\/peuim.com.pl\/en\/wp-content\/uploads\/sites\/2\/2020\/08\/20181115_090343-300x225.jpg\" alt=\"Rebuilding of regional road No. 676 Bia\u0142ystok \u2013 Supra\u015bl\" width=\"300\" height=\"225\" srcset=\"http:\/\/peuim.com.pl\/en\/wp-content\/uploads\/sites\/2\/2020\/08\/20181115_090343-300x225.jpg 300w, http:\/\/peuim.com.pl\/en\/wp-content\/uploads\/sites\/2\/2020\/08\/20181115_090343-1024x768.jpg 1024w, http:\/\/peuim.com.pl\/en\/wp-content\/uploads\/sites\/2\/2020\/08\/20181115_090343-768x576.jpg 768w, http:\/\/peuim.com.pl\/en\/wp-content\/uploads\/sites\/2\/2020\/08\/20181115_090343-1536x1152.jpg 1536w, http:\/\/peuim.com.pl\/en\/wp-content\/uploads\/sites\/2\/2020\/08\/20181115_090343-2048x1536.jpg 2048w, http:\/\/peuim.com.pl\/en\/wp-content\/uploads\/sites\/2\/2020\/08\/20181115_090343-470x352.jpg 470w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-135\" class=\"wp-caption-text\">Rebuilding of regional road No. 676 Bia\u0142ystok \u2013 Supra\u015bl<\/figcaption><\/figure>\n<h3><strong>Rebuilding of regional road No. 6<\/strong><strong>85 Zab\u0142ud\u00f3w \u2013 Nowosady<\/strong><\/h3>\n<p><strong>Date<\/strong>: from September 2017 to June 2019.\u00a0<strong>Value<\/strong>: PLN 48,8 million.<\/p>\n<p style=\"text-align: center;\">The reconstruction of the regional road on a section of 8.2 km covered the entire infrastructure, construction of engineering structures (including the construction of the bridge over the Rudnia river), earthworks, new construction along the entire length of the road section and bicycle path, and paving works (curbs, pavements, outskirts, bus bays, drainage elements).<\/p>\n<figure id=\"attachment_132\" aria-describedby=\"caption-attachment-132\" style=\"width: 225px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/peuim.com.pl\/en\/wp-content\/uploads\/sites\/2\/2020\/08\/IMG_20190722_115046-scaled.jpg\" target=\"_blank\" rel=\"noopener noreferrer\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-132 size-medium\" src=\"http:\/\/peuim.com.pl\/en\/wp-content\/uploads\/sites\/2\/2020\/08\/IMG_20190722_115046-225x300.jpg\" alt=\"Rebuilding of regional road No. 685 Zab\u0142ud\u00f3w \u2013 Nowosady\" width=\"225\" height=\"300\" srcset=\"http:\/\/peuim.com.pl\/en\/wp-content\/uploads\/sites\/2\/2020\/08\/IMG_20190722_115046-225x300.jpg 225w, http:\/\/peuim.com.pl\/en\/wp-content\/uploads\/sites\/2\/2020\/08\/IMG_20190722_115046-768x1024.jpg 768w, http:\/\/peuim.com.pl\/en\/wp-content\/uploads\/sites\/2\/2020\/08\/IMG_20190722_115046-1152x1536.jpg 1152w, http:\/\/peuim.com.pl\/en\/wp-content\/uploads\/sites\/2\/2020\/08\/IMG_20190722_115046-1536x2048.jpg 1536w, http:\/\/peuim.com.pl\/en\/wp-content\/uploads\/sites\/2\/2020\/08\/IMG_20190722_115046-470x626.jpg 470w, http:\/\/peuim.com.pl\/en\/wp-content\/uploads\/sites\/2\/2020\/08\/IMG_20190722_115046-scaled.jpg 1920w\" sizes=\"auto, (max-width: 225px) 100vw, 225px\" \/><\/a><figcaption id=\"caption-attachment-132\" class=\"wp-caption-text\">Rebuilding of regional road No. 685 Zab\u0142ud\u00f3w \u2013 Nowosady<\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>The core business of PEUiM is road construction. The Company performs projects mainly in Podlaskie<span class=\"more-button\"><a href=\"http:\/\/peuim.com.pl\/en\/roads\/\" class=\"more-link\">Read more<span class=\"screen-reader-text\">Roads<\/span><\/a><\/span><span class=\"more-button\"><a href=\"http:\/\/peuim.com.pl\/en\/roads\/\" class=\"more-link\"><span class=\"screen-reader-text\">Roads<\/span><\/a><\/span><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-30","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"http:\/\/peuim.com.pl\/en\/wp-json\/wp\/v2\/pages\/30","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/peuim.com.pl\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"http:\/\/peuim.com.pl\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"http:\/\/peuim.com.pl\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/peuim.com.pl\/en\/wp-json\/wp\/v2\/comments?post=30"}],"version-history":[{"count":5,"href":"http:\/\/peuim.com.pl\/en\/wp-json\/wp\/v2\/pages\/30\/revisions"}],"predecessor-version":[{"id":168,"href":"http:\/\/peuim.com.pl\/en\/wp-json\/wp\/v2\/pages\/30\/revisions\/168"}],"wp:attachment":[{"href":"http:\/\/peuim.com.pl\/en\/wp-json\/wp\/v2\/media?parent=30"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}